Top Iconic Prefabricated Building Projects in China

Prefabricated construction has become a transformative approach in modern architecture, offering faster construction, higher quality control, and reduced environmental impact. China, as a global leader in industrialized construction, has implemented numerous large-scale prefabricated projects that showcase the potential of modular design and advanced assembly techniques.

This article highlights the Top 10 Classic Examples of Prefabricated Buildings in China, spanning residential, commercial, educational, and emergency healthcare facilities. Each project demonstrates innovative construction methods, integration of modern technologies, and efficient project delivery, providing a benchmark for architects, developers, and EPC contractors worldwide.

 

List of the Top 10 Prefabricated Building Projects in China

  •  Project 1: Dunhuang Silk Road International Cultural Expo Project
  •  Project 2: Xiong'an Citizen Service Center Project
  •  Project 3: Huoshenshan Hospital Project (Wuhan)
  •  Project 4: Leishenshan Hospital Project (Wuhan)
  •  Project 5: Mini Sky City 10-Storey Modular Building (Changsha)
  •  Project 6: Yujing Xingfu Garden Prefabricated Housing Project (Shenzhen)
  •  Project 7: FAW Passenger Vehicle Institute Prefabricated Parking Garage (Changchun)
  •  Project 8: Chengshousi Steel Structure Residential Project (Beijing)
  •  Project 9: Shandong Jianzhu University Integrated Teaching and Laboratory Building
  •  Project 10: Nanjing Jiangning District Prefabricated Affordable Housing Project (Building 6-05)

 

Project 1: Dunhuang Silk Road International Cultural Expo Project

The Dunhuang Silk Road International Cultural Expo Project is one of China’s iconic large-scale prefabricated public building complexes. The project includes the International Conference Center, Grand Theater, International Hotel, and related supporting facilities.

  • Total floor area: 268,000 m²
  • Delivery model: EPC (Engineering, Procurement, Construction)
  • Main contractor: China State Construction (CSCEC)

The project adopted an industrialized prefabricated construction system combined with EPC delivery and a digital construction platform, forming the well-known “Dunhuang Model” for large-scale public buildings.

For the Dunhuang Grand Theater, 81.2% of the building components were factory-prefabricated. Full BIM-based coordination integrated design, procurement, and construction to improve accuracy and installation efficiency.

  • Main structures completed in: 104 days
  • Total project duration reduced: from 5 years to 8 months
  • Cost reduction: approximately 15%

This project is widely recognized as a benchmark for prefabricated construction and EPC delivery in complex public building projects.

 

Project 2: Xiong’an Citizen Service Center Project

The Xiong’an Citizen Service Center is the first major infrastructure project in Xiong’an New Area, serving functions such as government services, urban planning exhibition, and public administration.

  • Project significance: First landmark infrastructure project in Xiong’an New Area
  • Main functions: Government services, planning exhibition, public facilities

Compared with traditional construction methods, the project achieved:

  • 40% shorter construction period
  • Over 80% reduction in construction waste

The project adopted an integrated investment–construction–operation–fund management model. A joint fund was established and managed by Xiong’an Construction Investment Group and a China State Construction (CSCEC) consortium.

China State Construction provided a full lifecycle solution, acting as investor, contractor, developer, and long-term operation service provider, ensuring stable construction delivery and sustainable operation.

The project is widely regarded as the first showcase of Xiong’an’s development philosophy and created the so-called “Xiong’an Speed”:

  • 4 days: Installation of 3,100 tons of foundation reinforcement
  • 5 days: Completion of temporary site facilities
  • 7 days: Excavation of 120,000 m³ of earthwork
  • 10 days: Pouring of 35,500 m³ of foundation concrete
  • 25 days: Installation of 12,200 tons of steel structures
  • 40 days: Structural topping-out of all 7 steel buildings

From groundbreaking to full structural topping-out, the entire project was completed in approximately 1,000 hours, making it a benchmark for fast-track prefabricated steel construction combined with EPC delivery.

 

Project 3: Huoshenshan Hospital Project (Wuhan)

Huoshenshan Hospital is a landmark emergency prefabricated construction project built in Wuhan, China, to respond to the COVID-19 outbreak.

  • Project type: Emergency modular hospital
  • Location: Wuhan, Hubei Province

The hospital was constructed using a highly standardized modular steel structure system, with prefabricated units manufactured off-site and rapidly assembled on-site.

  • Total construction period: Approximately 10 days
  • Construction method: Prefabricated modular steel units
  • Delivery mode: Fast-track EPC-style coordination

The project demonstrated the advantages of prefabricated construction in speed, quality control, and large-scale coordination, particularly for emergency healthcare and temporary public facilities.

Huoshenshan Hospital has since become a globally recognized reference project for emergency modular buildings and rapid-deployment steel structures.

 

Project 4: Leishenshan Hospital Project (Wuhan)

Leishenshan Hospital is a large-scale emergency prefabricated hospital project built in Wuhan, China, as part of the COVID-19 response, following the Huoshenshan Hospital model.

  • Project type: Emergency modular hospital
  • Location: Wuhan, Hubei Province

The project adopted a modular steel structure system with standardized prefabricated units manufactured off-site and rapidly assembled on-site.

  • Construction period: Approximately 12 days
  • Construction method: Prefabricated modular steel units
  • Delivery mode: Fast-track EPC-style coordination

Compared with Huoshenshan Hospital, Leishenshan Hospital featured a larger scale, more complex functional layout, and improved medical infrastructure, demonstrating the scalability of modular prefabricated construction.

Leishenshan Hospital is widely recognized as a global benchmark for rapid-deployment modular healthcare facilities and emergency steel structures.

 

Project 5: Mini Sky City 10-Storey Modular Building (Changsha)

The Mini Sky City 10-storey modular building in Changsha is a well-known demonstration project showcasing the extreme construction speed achievable through modular prefabricated building systems.

  • Project type: Modular prefabricated building
  • Location: Changsha, Hunan Province

The building was constructed using a highly standardized modular steel structure system, with the main structural assembly completed on-site in approximately 28 hours.

  • Number of floors: 10
  • On-site assembly time: ~28 hours
  • Construction method: Factory-built modular steel units

This project is widely cited as a demonstration case illustrating how off-site manufacturing, standardization, and rapid on-site installation can significantly shorten construction timelines under controlled conditions.

The Mini Sky City project serves as a reference example for modular construction efficiency, rather than a typical delivery model for conventional commercial or residential developments.

 

Project 6: Yujing Xingfu Garden Prefabricated Housing Project (Shenzhen)

Yujing Xingfu Garden is a landmark prefabricated residential project in Shenzhen, and the city’s first EPC-delivered prefabricated housing development.

  • Location: Pingshan New District, Shenzhen
  • Project type: Prefabricated affordable housing
  • Total floor area: 64,050 m²
  • Buildings: 3 residential towers (31–33 floors)
  • Maximum height: ~98 meters
  • Housing units: 944 apartments

The project adopted an assembled integral shear wall structure with EPC (Engineering, Procurement, Construction) delivery, making it a milestone for high-rise prefabricated residential buildings in Shenzhen.

  • Prefabrication rate: ~50%
  • Assembly rate: ~70%

Yujing Xingfu Garden is recognized as:

  • Shenzhen’s first EPC prefabricated housing project
  • The highest prefabrication and assembly rate among similar shear wall projects in the city
  • The tallest assembled integral shear wall residential project in Shenzhen at the time

The project was jointly delivered by China State Construction (CSCEC) and CSCEC Science & Technology Group under an integrated “five-in-one” industrialized construction model, covering standardized design, factory production, on-site assembly, integrated MEP & interior systems, and digital project management.

This project serves as a benchmark for high-rise prefabricated affordable housing under EPC delivery in high-density urban environments.

 

Project 7: FAW Passenger Vehicle Institute Prefabricated Parking Garage (Changchun)

The FAW Passenger Vehicle Institute Prefabricated Parking Garage in Changchun is China’s first fully prefabricated multi-storey parking structure, representing a milestone in industrialized functional buildings.

  • Location: Changchun, Jilin Province
  • Project type: Fully prefabricated multi-storey parking garage
  • Total floor area: ~79,000 m²
  • Site area: 11,583 m²
  • Buildings: 2 blocks (North & South)

The underground structure was constructed using cast-in-place concrete, while the above-ground structure adopted a large-span precast double-T slab and shear wall system.

  • Number of floors: 7
  • Building height: 24 meters
  • Seismic design intensity: 7 degrees
  • Assembly rate: Over 90%

The parking layout features dual-direction scissor ramps, providing parking capacity for approximately 2,400 passenger vehicles.

The project involved systematic R&D covering structural systems, component manufacturing, and installation methods, resulting in:

  • 11 key construction technologies
  • 13 patented innovations
  • 2 provincial-level construction methods
  • 17 technical research papers

This project is widely regarded as a benchmark for prefabricated functional buildings, demonstrating the feasibility of high-assembly-rate industrialized construction for large-capacity parking and transportation-related facilities.

 

Project 8: Chengshousi Steel Structure Residential Project (Beijing)

The Chengshousi Steel Structure Residential Project is an assembled steel housing development in Beijing, demonstrating the application of full steel structure systems in mid- to high-rise residential buildings.

  • Location: Beijing, China
  • Project type: Prefabricated steel structure residential housing
  • Total site area: 6,691 m²
  • Total floor area: 31,700 m²
  • Buildings: 4 residential blocks
  • Building height: 9–16 floors

The project adopted a fully prefabricated steel structure system. All steel columns, steel beams, and steel truss composite floor decks were factory-manufactured and assembled on-site.

  • Structural system: Steel frame with steel plate shear walls
  • Floor system: Steel truss composite floor decks
  • Façade system: Precast concrete (PC) panels and AAC wall panels

Compared with traditional cast-in-place concrete structures, the project achieved a construction period reduction of over 50%.

The project was delivered under an EPC (Engineering, Procurement, Construction) model, allowing integrated coordination of design, manufacturing, and on-site installation.

This project serves as a reference case for steel structure residential buildings in dense urban environments, highlighting the advantages of speed, precision, and industrialized construction.

 

Project 9: Shandong Jianzhu University Integrated Teaching and Laboratory Building

The Integrated Teaching and Laboratory Building at Shandong Jianzhu University is China’s first prefabricated steel structure passive ultra-low-energy building, combining industrialized construction with advanced energy efficiency.

  • Location: Shandong Jianzhu University, New Campus, Shandong Province
  • Project type: Prefabricated steel structure + passive ultra-low-energy building
  • Total floor area: 11,936 m²
  • Main structures: Teaching & laboratory main block and auditorium classrooms

The building adopts a steel frame structure combined with:

  • ALC embedded interior walls
  • Truss reinforced concrete composite floor slabs
  • Prefabricated concrete stair units

Key innovations include:

  • Efficient integration of prefabricated steel structure with passive building systems
  • Sealed connection nodes with grouting and insulation materials ensuring airtightness and thermal performance
  • Optimized internal airtight layer in exterior walls through advanced beam-column layout
  • Special passive-design interior window installation method for improved thermal efficiency

The project serves as a demonstration and research reference for integrating prefabricated steel construction with passive ultra-low-energy technologies, providing insights for future similar buildings.

 

Project 10: Nanjing Jiangning District Prefabricated Affordable Housing Project (Building 6-05)

Building 6-05 is a 15-storey fully prefabricated residential building located in Jiangning District, Nanjing, representing one of China’s tallest and most advanced industrialized prefabricated residential structures.

  • Location: Jiangning District, Nanjing, China
  • Project type: High-rise prefabricated affordable housing
  • Total floor area: 10,380.59 m² (Above ground: 9,724.61 m², Underground: 655.98 m²)
  • Building height: 45 meters
  • Units: 196 apartments (2–15 floors), 1 underground bicycle garage
  • Structural system: Fully prefabricated frame with steel bracing
  • Prefabrication rate: ~75%

Key innovations include:

  • New prefabricated frame-steel bracing system for enhanced seismic performance and high prefabrication rate
  • All main structural components (columns, beams, slabs) and secondary elements (stairs, balconies, parapets) fully prefabricated
  • Improved beam-column connection nodes using threaded anchorage plates to simplify reinforcement installation and reduce clashes
  • Advanced wall infill system using lightweight autoclaved aerated concrete panels (NALC) and hollow ceramsite concrete panels, eliminating on-site masonry and plastering
  • Factory-produced modular kitchens and bathrooms
  • Integrated balcony-mounted solar water heaters for energy efficiency

The project achieves a 65% overall energy savings and demonstrates a fully industrialized, green construction approach with no external scaffolding, no on-site masonry, and high assembly efficiency.

 

Conclusion

These ten projects illustrate the versatility, efficiency, and innovation of China’s prefabricated building industry. From high-rise residential towers and multi-storey parking garages to emergency hospitals and ultra-low-energy educational facilities, each project demonstrates how prefabricated construction can address complex design requirements, accelerate schedules, and reduce costs.

As prefabricated and modular construction continues to gain global traction, these landmark projects offer valuable insights and practical examples for developers, EPC contractors, and urban planners seeking to adopt industrialized construction methods in their own regions.

0
Comments
Share:
Leave a Comment

Your Name*

Your Email*

Submit Comment
Speak To One of Our Experts
Name can't be empty
Email error!
Message can't be empty
Send message

*We respect your confidentiality and all information are protected.

People Also Viewed of
Shanghai Akoetech Building Technology Co., Ltd. is a leading prefabricated building manufacturer and turnkey project provider in China.
Call Us Now To Speak With A Steel Building Expert
Get a free estimate from the industry’s most experienced modular building team. We have a passion for prefabricated building solutions that bring your vision to life.
Request a Quote
Copyright © 2026 Akoetech All Rights Reserved
Privacy Policy Terms of Service Sitemap.html Sitemap.xml Powered by Globalsir
Set A Consultation Today
Name can't be empty
Message can't be empty
code
error