+86 136 0176 4940
info@akoetech.com
 
 

An innovative joint prefabricated inside the column achieving blind-bolt-connection NO MORE on-site welding and NO technical workers needed

Innovative solutions for modern construction

vsSystem Comparison 1
vs System Comparison 2
vs System Comparison 3
vs System Comparison 4
vs System Comparison 5
vs System Comparison 6
vs System Comparison 7

Comparison

    Masorny Structure S-CAS Structure (Hybrid Structure)
Composition Comparing a typical mid-rise residential Structure: Brick/stone/blocks bounded with mortat
Envelope: traditional paint
Structure: CCP panels (or S-CAS bolted steel if > 3 stories)
Envelop: CCP panels
Optimal Application Scenarios Low-rise Residentials
Mid-rises Residentials
High-rises Residentials  
Super-high-rises  
Industrial buildings  
Commercial buildings (Mall, hotel, office)  
Transportation Infrustratures(Road, bridge, station, airports)  
Social Infrastructures (Church, stadium, hospital)
Economic Benefits Construction Period 100%  
Overall Cost 100%  
Prefabrication rate (structure and envelop) / 95%-100%
Interior space flexibility Some adjustments Flexible layout and adjustment
Extreme weathers Earthquake little risk No risk
Hurricane No risk No risk
Wildfire No risk No risk
Design Designing cost    
Factory Prefabrication Quantity of workers / /
Quality of workers / /
Manufacture area needed / /
Production capacity / /
Transportation Structural and envelope components Cost very high Cost very low, standard and regular shaped steel components. Container-shippable CCP panels
On-site Construction Scaffolding for structure and envelop Needed No need
On-site Mold/support Needed No need
Wet working A lot No need
Welding No need No need
Painting and coating (structure or envelope) Needed No need
Quantity of workers 100%  
Quality of workers Various skilled workers Ordinary worker
Subsequent Maintenance Exterior envelope Needed No need
Dismantle Blasting/cutting/crushing A lot No
Dust/noise pollution A lot No
Reuse and Recycle Structure Non-recycable Recycable
Envelope Non-recycable Recycable

 

Comparison

    Timber Frame Structure S-CAS Structure (Hybrid Structure)
Composition Comparing a typical mid-rise residential Structure: Timber
Envelope: multi-layer/multi-material treatment
Structure: CCP panels (or S-CAS bolted steel if > 3 stories)
Envelop: CCP panels
Optimal Application Scenarios Low-rise Residentials
Mid-rises Residentials
High-rises Residentials  
Super-high-rises  
Industrial buildings  
Commercial buildings (Mall, hotel, office)  
Transportation Infrustratures(Road, bridge, station, airports)  
Social Infrastructures (Church, stadium, hospital)
Economic Benefits Construction Period 100%  
Overall Cost 100%  
Prefabrication rate (structure and envelop) / 95%-100%
Interior space flexibility some adjustments Flexible layout and adjustment
Extreme weathers Earthquake No risk No risk
Hurricane Risky No risk
Wildfire Risky No risk
Transportation Structural and envelope components Cost moderate Cost very low, standard and regular shaped steel components. Container-shippable CCP panels
On-site Construction Scaffolding for structure and envelop Needed No need
On-site Mold/support Needed No need
Wet working Needed No need
Welding No need No need
Painting and coating (structure or envelope) Needed No need
Quantity of workers 100%  
Quality of workers Various skilled workers Ordinary worker
Subsequent Maintenance Exterior envelope Needed No need
Dismantle Blasting/cutting/crushing A llittle No
Dust/noise pollution   No
Reuse and Recycle Structure Recycable Recycable
Envelope Recycable Recycable

Comparison

    Cast-in-place Concrete S-CAS Structure (Hybrid Structure)
Composition Comparing a typical high-rise building Structure: Concrete
Envelope: Concrete and multi-material treatment
Structure: S-CAS bolted steel structure (concrete-filled columns and beams can be used)
Envelop: S-CAS CCP panels
Optimal Application Scenarios Low-rise Residentials
Mid-rises Residentials
High-rises Residentials
Super-high-rises
Industrial buildings
Commercial buildings (Mall, hotel, office)
Transportation Infrustratures(Road, bridge, station, airports)
Social Infrastructures (Church, stadium, hospital)
Economic Benefits Construction Period 100% 30%
Overall Cost 100% 90%-95%
Prefabrication rate (structure and envelop) 0% 95%-100%
Interior space flexibility Some adjustments Flexible layout and adjustment
Extreme weathers Earthquake No risk No risk
Hurricane No risk No risk
Wildfire No risk No risk
Factory Prefabrication Quantity of workers / /
Quality of workers / /
Manufacture area needed / /
Production capacity / /
Transportation Structural and envelope components / Cost very low: standard and regular shaped steel components and container-shippable CCP panels
On-site Construction Scaffolding for structure and envelop Needed No need
On-site Mold/support Needed No need
Wet working A lot No need
Welding No need No need
Painting and coating (structure or envelope) Needed No need
Quantity of workers 100% 10%
Quality of workers Various skilled workers Ordinary worker
Subsequent Maintenance Exterior envelope Needed No need
Dismantle Blasting/cutting/crushing A lot No
Dust/noise pollution A lot No
Reuse and Recycle Structure Non-recycable Recycable
Envelope Non-recycable Recycable

Comparison

    Pre-cast Concrete S-CAS Structure (Hybrid Structure)
Composition Comparing a typical high-rise building Structure: Precast concrete
Envelope: Precast concrete and multi-material treatment
Structure: S-CAS bolted steel structure (concrete-filled columns and beams can be used)
Envelop: S-CAS CCP panels
Optimal Application Scenarios Low-rise Residentials
Mid-rises Residentials
High-rises Residentials
Super-high-rises  
Industrial buildings
Commercial buildings (Mall, hotel, office)
Transportation Infrustratures(Road, bridge, station, airports)
Social Infrastructures (Church, stadium, hospital)
Economic Benefits Construction Period 100% 20%
Overall Cost 100% 75%-85%
Prefabrication rate (structure and envelop) 40%-60% 95%-100%
Interior space flexibility Some adjustments Flexible layout and adjustment
Extreme weathers Earthquake No risk No risk
Hurricane No risk No risk
Wildfire No risk No risk
Factory Prefabrication Quantity of workers 100% 5%-10%
Quality of workers Various skilled workers Ordninary workers
Manufacture area needed 100% 20%
Manufacture capacity 100% 500%
Transportation Structural and envelope components Cost very high, can not afford global shipping Cost very low, standard and regular shaped steel components. Container-shippable CCP panels
On-site Construction Scaffolding for structure and envelop Needed No need
On-site Mold/support Needed No need
Wet working Moderate No need
Welding Some No need
Painting and coating (structure or envelope) Needed No need
Quantity of workers 100% 20%
Quality of workers Various skilled workers Ordinary worker
Subsequent Maintenance Exterior envelope Needed No need
Dismantle Blasting/cutting/crushing A lot No
Dust/noise pollution A lot No
Reuse and Recycle Structure Non-recycable Recycable
Envelope Non-recycable Recycable

Comparison

    Steel Structure (Traditional bolt & weld structure) S-CAS Structure (Hybrid Structure)
Composition Comparing a typical high-rise building Structure: conventional bolt&weld steel
Envelope: Multi-layer/multi-material treatment (curtain wall, ALC panels, etc.)
Structure: S-CAS bolted steel structure (concrete-filled columns and beams can be used)
Envelope: S-CAS CCP panels
Optimal Application Scenarios Low-rise Residentials
Mid-rises Residentials
High-rises Residentials
Super-high-rises
Industrial buildings
Commercial buildings (Mall, hotel, office)
Transportation Infrastructures (Road, bridge, station, airports)
Social Infrastructures (Church, stadium, hospital)
Economic Benefits Construction Period 100% 50%
Overall Cost 100% 80%-90%
Prefabrication rate (structure and envelop) 50%-70% 95%-100%
Interior space flexibility Flexible layout and adjustment Flexible layout and adjustment
Extreme weathers Earthquake No risk No risk
Hurricane No risk No risk
Wildfire No risk No risk
Factory Prefabrication Quantity of workers 100% 15%-20%
Quality of workers Various skilled workers Ordinary worker
Manufacture area needed 100% 33%
Production capacity 100% 250%
Transportation Structural and envelope components Cost high, irregular shaped steel components Cost very low, standard and regular shaped steel components. Container-shippable CCP panels
On-site Construction Scaffolding for structure and envelop Needed No need
On-site Mold/support No need No need
Wet working A lot (on-site fire-resistant painting) No need
Welding A lot No need
Painting and coating (structure or envelope) Needed No need
Quantity of workers 100% 20%
Quality of workers Various skilled workers Ordinary worker
Subsequent Maintenance Exterior envelope Needed No need
Dismantle Blasting/cutting/crushing A little No
Dust/noise pollution A little No
Reuse and Recycle Structure Recyclable Recyclable
Envelope Partly-recyclable Recyclable

 

Comparison

    Light Steel Frame Structure S-CAS Structure (Hybrid Structure)
Composition Comparing a typical mid-rise residential Structure: Light steel
Envelope: multi-layer/multi-material treatment
Structure: CCP panels (or S-CAS bolted steel if > 3 stories)
Envelop: CCP panels
Optimal Application Scenarios Low-rise Residentials
Mid-rises Residentials
High-rises Residentials  
Super-high-rises  
Industrial buildings  
Commercial buildings (Mall, hotel, office)  
Transportation Infrustratures(Road, bridge, station, airports)  
Social Infrastructures (Church, stadium, hospital)  
Economic Benefits Construction Period 100% 33%-40%
Overall Cost 100% 80%
Prefabrication rate (structure and envelop) 70% 95%-100%
Interior space flexibility Some adjustments Flexible layout and adjustment
Extreme weathers Earthquake little risk No risk
Hurricane little risk No risk
Wildfire little risk No risk
Factory Prefabrication Quantity of workers 100% 60%
Quality of workers Various skilled workers Ordinary worker
Production capacity 100% 400%-500%
Transportation Structural and envelope components Cost low, standard components Cost very low, standard and regular shaped steel components. Container-shippable CCP panels
On-site Construction Scaffolding for structure and envelop Needed No need
On-site Mold/support No need No need
Wet working No need No need
Welding No need No need
Painting and coating (structure or envelope) No need No need
Quantity of workers Various skilled workers Ordinary worker
Quality of workers 100% 33%
Subsequent Maintenance Exterior envelope Needed No need
Dismantle Blasting/cutting/crushing No No
Dust/noise pollution No No
Reuse and Recycle Structure Recycable Recycable
Envelope Non-recycable Recycable

Comparison

    Modular building S-CAS Structure (Hybrid Structure)
Composition Comparing a typical mid-rise residential Structure: Light steel/steel/concrete
Envelope: multi-layer/multi-material treatment
Structure: CCP panels (or S-CAS bolted steel if > 3 stories)
Envelop: CCP panels
Optimal Application Scenarios Low-rise Residentials
Mid-rises Residentials
High-rises Residentials  
Super-high-rises  
Industrial buildings  
Commercial buildings (Mall, hotel, office)  
Transportation Infrustratures(Road, bridge, station, airports)  
Social Infrastructures (Church, stadium, hospital)  
Economic Benefits Construction Period 100% 95%-100%
Overall Cost 100% 67%
Prefabrication rate (structure and envelop) 90%-95% 95%-100%
Interior space flexibility Fixed layout, no adjustment Flexible layout and adjustment
Extreme weathers Earthquake little risk No risk
Hurricane little risk No risk
Wildfire little risk No risk
Factory Prefabrication Quantity of workers 100% 40%
Quality of workers Various skilled workers Ordinary worker
Production capacity 100% 1500%
Transportation Structural and envelope components Cost very high, non-standard size compare to GP container Cost very low, standard and regular shaped steel components. Container-shippable CCP panels
On-site Construction Scaffolding for structure and envelop Needed No need
On-site Mold/support No need No need
Wet working No need No need
Welding No need No need
Painting and coating (structure or envelope) No need No need
Quantity of workers Various skilled workers Ordinary worker
Quality of workers 100%  
Subsequent Maintenance Exterior envelope Needed No need
Dismantle Blasting/cutting/crushing No No
Dust/noise pollution No No
Reuse and Recycle Structure Recycable Recycable
Envelope Non-recycable Recycable
Shanghai Akoetech Building Technology Co., Ltd. is a leading prefabricated building manufacturer and turnkey project provider in China.
Call Us Now To Speak With A Steel Building Expert
Get a free estimate from the industry’s most experienced modular building team. We have a passion for prefabricated building solutions that bring your vision to life.
Request a Quote
Copyright © 2025 akoetech All Rights Reserved
Privacy Policy
Terms of Service
Sitemap.html Sitemap.xml Powered by Globalsir
Set A Consultation Today
Name can't be empty
Message can't be empty
code
error